Bethel Lutheran Church, Morton, IL
This congregation had been bursting at the seems for many years. The new
facility is designed to accommodate their growth for the next decade. The
dedicated worship room has platform space to accommodate both their
traditional and contemporary styles of worship.
BLDD Architects of Decatur, Illinois did the design work. PJ Hoerr of Normal,
Illinois served as the construction company. Jordan Audio Consultants of
Joplin, Missouri completed the necessary engineering and wrote the AV
specifications for the acoustic treatment, audio reinforcement and video
presentation systems. Thompson Electronics of Peoria, Illinois completed the
AV contracting and built the systems. They did an excellent job.
Wesley United Methodist, Iola, KS
A complete audio and video system upgrade was ready to begin when a fire
and 20,000 gallons of water caused hundreds of thousands of dollars damage
to the 1920s building. After the clean up modifications were made to the
project and even better solutions were created.
Jordan Audio Consultants of Joplin, Missouri was hired to engineer and specify
audio reinforcement and video presentation systems. Total Electronics
Contracting of Joplin, Missouri assembled and built the systems with excellent
results.
College Heights Church, Joplin, MO
1700 seats was a big jump for this local church. Their previous auditorium only
accommodated 400. The larger space was needed for both the Sunday
worship and week school assemblies.
Jordan Audio Consultants of Joplin, Missouri completed the necessary
engineering and wrote the AV specifications for the acoustic treatment, audio
reinforcement and video presentation systems. The systems were built by the
tech team of the church with guidance from JAC. The line arrays were sold and
installed by Southwest AV of Springfield, Missouri. The systems went together
smoothly and have been serving well for years.
First Christian Church, Parsons, KS
This sanctuary built in 1981 was still using the original technology with only
minor additions and improvements. One massive problem was that the choir
could not hear themselves singing. The first modification was to add hard
surfaces behind the choir - the difference was astonishing.
Jordan Audio Consultants was commissioned with engineering and specifying
new audio and video systems. The systems were assembled and installed by
Total Electronics Contracting of Joplin, Missouri. There work was outstanding.
Calvary United Methodists, Normal, IL
A multipurpose family life center with basketball court and elevated walking
track makes for a unique space for AV presentations. The core of system (main
speakers, amplifier, processing) is installed. The variables (console,
microphones, monitors) are brought in from other systems when needed for
special events.
BLDD Architects of Decatur, Illinois did the design work. PJ Hoerr of Normal,
Illinois served as the construction company. Jordan Audio Consultants of
Joplin, Missouri completed the necessary engineering and wrote the AV
specifications. Fulkerson AV of Bloomington, Illinois was the AV contractor.
They were easy to work with and did a great job with a small budget.
Bethany Community Church, Morton, IL
This growing congregation has been a “portable church” meeting each week in
the local community auditorium. This facility just north of town is the beginning
our their future campus. A large multipurpose space with classrooms, offices,
kitchen and nurseries.
BLDD Architects of Normal, Illinois did the design work. PJ Hoerr of Normal,
Illinois served as the construction company. Jordan Audio Consultants of Joplin,
Missouri completed the necessary engineering and wrote the AV specifications
for the acoustic treatment, audio reinforcement and video presentation
systems. Thompson Electronics was the winning AV contractor. They always do
an excellent job..
“Helping you sound your best”
JordanAudioConsultants
A FEW RECENT PROJECTS
Well Spring Church, Webb City, MO
A newer church constructing their first purpose built worship space with 300
seats and an asymmetrical approach to both platform and seating.
Jordan Audio Consultants of Joplin, Missouri completed the necessary
engineering and wrote the AV specifications for the acoustic treatment, audio
reinforcement and video presentation systems. The systems were built by the
tech team of the church with guidance from JAC.